UPRVUNL Recruitment 2024 Apply online at uprvunl.org
UPRVUNL Recruitment 2024: As on Today UPRVUNL job notifications are updated here. Below are the Active and Upcoming Uttar Pradesh Rajya Vidyut Utpadan Nigam (UPRVUNL) vacancy details. Check the latest UPRVUNL jobs based on your qualification and apply through official website uprvunl.org
Organization | Post Names | Qualification | Last Date | Apply Details |
---|---|---|---|---|
UPRVUNL | Mining Engineer, Geologist (2) | Diploma, Degree in Mining Engineering, Masters Degree | 02-Apr-2024 | Job Details |
UPRVUNL | Junior Engineer, Assistant Accountant (Various) | 12th, Diploma, Degree, M.Sc | 30-Jul-2023 | Job Details |
UPRVUNL | Computer Assistant (31) | Degree | 06-Oct-2022 | Job Details |
UPRVUNL | Junior Engineer (Trainee), Pharmacist (31) | Diploma | 19-Sep-2022 | Job Details |
UPRVUNL | Technician (179) | 10th, ITI | 05-Aug-2022 | Job Details |
UPRVUNL | Accounts Clerk, Assistant Review Officer (66) | Degree, B.Sc, M.Sc, B.Com | 25-Jun-2022 | Job Details |
UPRVUNL | Assistant Engineer (Trainee) (125) | Degree in Engineering/Technology | 14-Jun-2022 | Job Details |
UPRVUNL | Junior Engineer, Assistant Accountant (134) | 12th, Diploma, Degree, M.Sc | 21-Mar-2022 | Job Details |
UPRVUNL | Experts, Consultants (6) | B.E or B.Tech, B.Sc | 15-Mar-2022 | Job Details |
UPRVUNL | Mining Engineer, Geologist (2) | Degree, Master's Degree | 15-Jan-2022 | Job Details |
About UPRVUNL 2024
UPRVUNL is a wholly owned state thermal power utility with a present generating capacity of 5474 MW, operating 4 Thermal Power Stations within Uttar Pradesh. Poised to contribute in the growth of state, we’re in the process of adding a further 3960 MW capacity with supercritical technology to our existing fleet.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) was constituted on dated 25.08.1980 under the Companies’ Act 1956 for the construction of new thermal power projects in the state sector. The first Thermal Power Station constructed by UPRVUNL was Unchahar Thermal Power Station of 2X210 MW capacity and it was transferred to NTPC on dated 13.02.1992. On dated 14.01.2000, in accordance to U.P. State Electricity Reforms Acts 1999 and operation of U.P. Electricity Reforms Transfer Scheme 2000, U.P. State Electricity Board, till then responsible for generation, transmission and distribution of power within the state of Uttar Pradesh, was unbundled and operations of the state sector thermal power stations were handed over to uprvunl.
Today it is looking after operations of 4 thermal power plants located in different parts of U.P., with a total generation capacity of 5474 MW with planting facility as follows.